Infill

Sean came back on site with his digger for two days to infill around the piers. This required taking the rock face back by 1.5m breaking the rock up as infill between the piers in order to make the site level for the rest of the build.

Infill1


Luckily we also had some rock left over form the excavations for the Blackhouse so Sean used this to complete the infill and grade the track more gently into the site.

Infill2

While he was back I put in the drainage to the soak away from the house and made sure the pop ups for water, electricity, and network connection were in the correct place inside the house.

InfillSoakAway

So all the work that we had so far done was out of sight. But we now had the base complete and were ready to begin on the wooden structure of the studio. Floor first.